Ranger Painting
Austin Painters
HOUSE PAINTING · AUSTIN, TX

Austin Painters

5.0 from 31+ Google Reviews

Austin painters who know the difference between a 1950s ranch and a hillside stucco build, because those are two entirely different jobs.

No Deposit
BBB A+ Accredited
5.0 Google (31 reviews)
$25k Good Contractor List Guarantee
Fully insured
Q

What do Austin painters charge, and how long does the job take?

Exterior work on the north and west side runs $3,500 to $9,500 and takes two to three days, though a multi-level hillside home takes longer because of access. Interior runs $2,500 to $7,500, cabinets $3,000 to $9,000. Your written estimate fixes all of it beforehand — prep, products, coat count and warranty term. Ranger serves 78757, 78759, 78727 and 78732 from a Cedar Park base.
North and west Austin is really two housing markets
THE TWO MARKETS

North and west Austin is really two housing markets

THE TWO MARKETS

North and west Austin is really two housing markets

On one side there is the mid-century ranch belt — Allandale, Crestview, Wooten — built through the 1950s and 60s on flat, tree-lined lots. On the other, the hillside builds of Great Hills, Steiner Ranch and the newer sections off 620, thirty to fifty years younger and made of different materials entirely. They want almost nothing in common from a painting contractor, and the estimate should look different for each.
01

The Mid-Century Ranch Belt (Allandale · Crestview · Wooten)

Built in the 1950s and 60s on flat, tree-lined lots. Features original wood siding and trim that requires multi-layer scraping, edge-sanding, lead safety compliance, and moisture management under heavy tree canopy.
02

The Hillside Builds (Great Hills · Steiner Ranch · 620)

Thirty to fifty years younger on steep, lake-facing slopes. Built with breathable stucco over frame, limestone, and fiber-cement that require specialized masonry coatings, multi-story staging, and high western UV protection.
What does not change is the arrangement: a written scope before you commit, $0 deposit, and payment only after a project manager has walked the finished job with you.
The mid-century ranch belt: patience is the whole job
ALLANDALE · CRESTVIEW · WOOTEN

The mid-century ranch belt: patience is the whole job

ALLANDALE · CRESTVIEW · WOOTEN

The mid-century ranch belt: patience is the whole job

These houses are sixty or seventy years old, and that age is the story.
01

The substrate has history

A home built in 1958 has been painted somewhere between six and a dozen times, and those coats have not all bonded to each other equally well. What a crew is really doing is deciding which layers stay and which come off, because a new coat over one that has already let go fails on the same schedule as the layer beneath it.
02

Wood is a live material

Original siding, fascia and trim here has expanded and contracted through seventy Texas summers. It wants scraping back to sound material, sanding the edges so the transition does not telegraph through, spot-priming every exposed area, and replacing failed boards rather than coating over soft ones.
03

Age brings a legal dimension

Homes built before 1978 may contain lead-based paint, and work that disturbs those surfaces carries specific requirements around testing and containment. It belongs in the estimate conversation, not as a discovery mid-scrape.
04

The canopy cuts both ways

Heavy shade protects color from UV, which genuinely helps. It also keeps north-facing walls damp longer, which invites mildew, and where oaks overhang, tannin staining. Both get treated and sealed rather than painted over.
The hillside builds: masonry, exposure and access
GREAT HILLS · STEINER RANCH · 620

The hillside builds: masonry, exposure and access

GREAT HILLS · STEINER RANCH · 620

The hillside builds: masonry, exposure and access

Move west and every variable inverts. Several of these neighborhoods run down toward Lake Austin and the Lake Travis arms, and the lake-facing lots take reflected light on top of direct sun.
01

The materials change completely

Stucco over frame, dressed limestone, manufactured stone and fiber-cement replace the wood and painted brick of the older belt. Stucco and stone are masonry, and masonry has one non-negotiable requirement: the coating must be breathable. Moisture moves through these walls, and a sealed film-forming product traps it. Blistering follows within a couple of seasons.
02

Exposure replaces shade as the problem

Cleared hillside lots, little mature canopy, long western sightlines — the views people bought the home for. The same aspect means the west elevation takes direct afternoon sun for hours, and those walls run a full stage of wear ahead of the rest of the house.
03

Elevation changes the physical job

A three-story elevation dropping down a slope is a different proposition from a single-story ranch. Access, staging and safety all cost more, and an estimate that does not reflect the terrain has not accounted for the work.
04

Cracks carry information

Fine hairline crazing in stucco is normal and bridges under a flexible coating. Wider or stepped cracking can indicate movement, and coating over it solves nothing. A crew that stops to show you a crack before deciding how to treat it is doing the job properly.
Two things hold true across the whole service area
CONSTANTS

Two things hold true across the whole service area

CONSTANTS

Two things hold true across the whole service area

01

Trim, fascia and soffits go first

They take the most direct weather of anything on a house, and they are why an otherwise sound exterior starts to look tired. On plenty of homes a trim refresh buys several years before the body needs anything.
02

Color depth carries a maintenance cost

Deep colors absorb more UV and give up their color sooner, particularly on the west side of a building. Worth knowing before you choose rather than after.
LOCAL DEMAND

What Austin homeowners actually call about

Across Austin the work clusters tightly, and Ranger runs dedicated painting services to cover it:
01

Exterior Painting & Repaints

Full exterior repaints are the largest share of the work, usually taking two to three days on a standard subdivision home, weather permitting.
02

Interior Painting & Wall Upgrades

Interior painting is usually about replacing builder-grade flat walls with a durable, washable eggshell on walls and semi-gloss on trim.
03

Cabinet Painting & Refinishing

Refinishing costs a fraction of replacement — doors come off and get labeled, factory coating is degreased and deglossed, and the finish hardens before rehanging.
04

Trim & Front-Door Refreshes

Trim and front-door refreshes are the most requested project of the year and yield the highest instant return on investment for curb appeal.
Most homes need two or three of the five, not all of them. If you want to find the right starting point, the free estimate will tell you which walls need attention this year and which can wait a season.
One process, two very different inspections
THE PROCESS

One process, two very different inspections

THE PROCESS

One process, two very different inspections

01

The walk changes with the house

In the ranch belt the questions are archaeological — how many coats are up there, which of them have let go, whether the fascia is still sound under the finish, and whether a pre-1978 build brings lead into the conversation. On a hillside property the questions are material and physical instead: what the stucco or stone will tolerate, what the west elevation has already given up, and how a crew safely reaches a third story on a slope. Same company, same standard, two genuinely different conversations.
02

The paperwork never changes

Whatever the house turns out to be, you receive the same document before committing a dollar: the prep sequence broken into discrete steps, the products named, the coat count stated, every surface itemized, the exclusions listed, the timeline, and the warranty term that applies to your project. Nathan Wingate founded Ranger after around twenty years around the trades, and that document is the standard he set.
03

One crew, start to finish

A dedicated painting crew takes the project and stays with it, rather than rotating between sites and handing your house to whoever is free that morning.
04

The last hour is the one that counts

A project manager walks the finished job with you. Anything that goes on the punch list gets put right while the crew is still on site — and only then does an invoice appear.
YOUR PROTECTION

Texas issues no painting license — here is what to verify instead

Homeowners are told to hire a contractor with a license. In this trade, in this state, that advice has nowhere to land: Texas issues no state license for painting contractors. There is no board, no examination and no registry to look anyone up in. Which means the checks that remain are the ones actually worth making.
01

Insurance, verified at the source

Ranger carries general liability and workers compensation, and the certificate comes to you from the insurance agent rather than as a logo on a website. Anyone can print a badge. A certificate direct from an agent is a document.
02

A warranty with a number on your estimate

Up to a 5-year written workmanship warranty, where the exact term is set by the package you choose and printed on your paperwork. It is commonly three, four or five years. Staining carries none. What governs is the estimate in your hand, never a headline.
03

A third party with money at stake

Every project is backed by a $25,000 Good Contractors List guarantee — an independent organization standing behind the work alongside Ranger. It is a promotional guarantee, not a bond, and the distinction is worth stating plainly.
04

BBB A+ Accredited

BBB A+ Accredited, and 5.0 across 31 Google reviews.
05

Nothing due up front

$0 deposit. You pay after the final walk-through, once you have looked the work over in daylight.
COMMON QUESTIONS

Austin Painting Questions

GET STARTED

Find out which Austin your house belongs to

Whether yours is a 1958 ranch under the oaks or a limestone build looking west over the hills, the first useful step is the same: someone measures it, reads it, and puts the whole scope in writing. Ranger Painting covers north and west Austin from a Cedar Park base, and the estimate costs you nothing.

Call (512) 537-7000
5.0★ on Google (31 reviews)
$25,000 Good Contractors List guarantee
General Liability and Workers' Compensation
BBB A+ Accredited
Ranger Painting in Austin
SERVICES AVAILABLE

What Ranger paints in Austin

Ranger's painting services cover every exterior and interior surface on Austin homes: exterior painting built for the Texas sun, interior painting that keeps your home livable, cabinet painting sprayed for a factory-smooth look, and specialty brick and stucco coatings named in writing. Each service is priced in a clear, documented scope, with premium products and the color choices left to you.

Call Now